Project South Port dock Reconstruction Eilat Port

Eilat South Platform

Project South Port dock Reconstruction Eilat Port Client: Israel Ports Company Project description As part of this project, Phase B work was carried out on the restoration of the main dock in the port of Eilat. The main platform, which is about 530 meters long, as part of the project the southern part was restored […]

The establishment of 12 breakwaters in Netanya

Netanya

The construction of breakwaters in front of the Netanya beaches. The client of the work the governmental company for the protection of the cliffs of the Mediterranean Sea:. Performance period 2020 -2023 . Description of the project: The establishment of a breakwater system. The breakwater array that was established to protect a cliff that runs along […]

Reconstruction and rehabilitation of docks 1-6 at Haifa port

Project 156

Ordered by Israel Port Development & Assets Company ltd. (IPC) Project Overview The project "Reconstruction and rehabilitation of docks 1-6" at Haifa port, consists of rehabilitating docks 1-4 with an approximate length of 600 meters, and reconstruction of docks 5-6 with an approximate length of 180 meters. docks 1-4 were constructed on top of different […]

Construction of new marine department basin in Haifa port

Construction of new marine department basin in Haifa port

Ordered By Port and Railway Authority Haifa Port Project Overview The Project "Construction of new marine department basin in Haifa port" requiered a construction of a new key in the length of 175 meters by the use of a 25 meters long combination wall; type AZ-48. Also, a 150 meters long pier was constructed ontop […]

Reinforcement of breakwaters in Tel Aviv

Reinforcement of breakwaters in Tel Aviv

Ordered by Atarim Tourist Project Development Corp.Tel-Aviv Jaffa Ltd. Project Overview Reconstructing of disconnected breakwaters in front of Tel Aviv by adding more then 6,000 ton of rocks that where transfer to the site on special flat top barges and floating crane of Maagan. Main elements of the project Spply and placement of 8-12ton Dolomite […]

Construction of Chemical Terminal One and Two in Haifa Port

Construction of Chemical Terminal One and Two in Haifa Port

Ordered by Israel Port Development & Assets Company ltd. (IPC) Project Overview The project "Construction of Chemical Terminal One and Two in Haifa Port" required the construction of a new pier in the length of 245 meters, to replace the existing pier which was built 40 years ago. The new pier was built to a […]

Construction of a New Marine for 350 Yachts in TRNC Cyprus

Construction of a New Marine for 350 Yachts in TRNC Cyprus

Ordered by Karpaz Bay Marine (KBR) Project Overview The project "Construction of a New Marine for 350 Yachts in TRNC Cyprus" required the construction of a brand new Marine, which could occupy 350 yachts. This complicated project included a unique excavation of 4-5 meter rock layer. This was achieved by the use of a jack barge, […]

Reconstruction of Key A North

Reconstruction of Key A North

Ordered By Israel Shipyards Ltd Project Overview The project "Reconstruction of key A North" required the construction of a new key in the length of 210 meters by the use of a 34 meters long combination wall; type 1180D of ARCELOR. This type of combination wall, was never been used before within Israel. Furthermore, underwater […]