Sea Drilling

Maagan have supplied all the marine infrsrcteur for soil investigation for the extension of Haifa port and new navy base such as 2 jack barges, 4 tug boats, divers, floating crane and more.
Dead Sea Pile driving

Driving of steel pile type PU607 with the length of 20m each into the salt and salt mushrooms, it was the first time ever that this was done. We have done the pile driving with PVE-110m .
On-site dynamic load test for existing concrete piles

MAAGAN performs dynamic load tests by dropping a weight of different values at different heights on an existing pole. Load sensors are situated on the pile and are measuring the wave power which is transferred to the pile following the drop of the weight. This method of load tests, allow a short time execution at […]
Support of GADOT South Jetty at Kishon port

Ordered by Israel Port Development & Assets Company ltd. (IPC) Project Overview The project "Support of GADOT South Jetty at Kishon port" required MAAGAN to supply and install 40 steel pipes in the diameters of 14 " , 24" , 26 " , 28" and in the length of 24 meters on both sides of the pier, and […]
Development of Ein-Gev Haven, North side

Ordered By Government Tourist Corporation Project Overview The project "Development of Ein-Gev Haven, North side", entails the construction of a new pier in the length of 48m, and extension of the boats syncrolift. Moreover, the harbor shall be deepened to -215.5m below sea, to enable access to vessels with a draft of 5m.Among the many […]
Construction of a pier for the Israel Electric Corp. at Haifa port
Reconstruction of the fisherman's Pier at Acre Port

Ordered By Ministry of Agriculture and Rural Development Project Overview The project "Reconstruction of the fisherman's Pier at Acre Port", consisted of a complete dismantle of the existing pier and construction of an "open" pier build on-top of steel pipes filled with cement. Also, the project required the construction of a new concrete pavement, and […]
PLEM Pile Installation

Ordered by: Petroleum & Energy Infrastructures Ltd. (PEI) Project Overview The project required the fabrication, delivery and driving of four 20 meters long piles for the purpose of replacing an underwater fuel line in vicinity of the gulf of Haifa in Israel. The project was executed by a vibrational hammer type PVE 50M, held by […]
Reconstruction of Key C

Ordered by: Israel Shipyards Ltd. Project Overview: The Project "Reconstruction of Key C" consists of the rehabilitation of the existing key between the Kishon pier and pier B of at the Israel shypyard, to enable the docking of ships. A reinforcment will be done by the use of front end combination wall which will be […]
Construction of new marine department basin in Haifa port

Ordered By Port and Railway Authority Haifa Port Project Overview The Project "Construction of new marine department basin in Haifa port" requiered a construction of a new key in the length of 175 meters by the use of a 25 meters long combination wall; type AZ-48. Also, a 150 meters long pier was constructed ontop […]