Ordered By
Government Tourist Corporation
Project Overview
The project "Development of Ein-Gev Haven, North side", entails the construction of a new pier in the length of 48m, and extension of the boats syncrolift. Moreover, the harbor shall be deepened to -215.5m below sea, to enable access to vessels with a draft of 5m.Among the many improvements, the handicap access shall be improved by the construction of a disabled access ramp, and a new 15t winch shall be installed.
Main elements of the project
- Measurements and markings at land and sea.
- Supply and driving of combination wall 14.5 meters in length.
- supply and driving of 18 meter long piles.
- Excavation, filling and disposal of the surplus excavated
- Supply and installation of a floating dock
- Extension of the boats syncrolift, replacement of winch, engine, and towing experiment
- Construction of disabled access ramp
- Deepening the harbor to 215.5- below sea level
- Concrete work