Development of Ein-Gev Haven, North side

Ordered By

Government Tourist Corporation

Project Overview

The project "Development of Ein-Gev Haven, North side", entails the construction of a new pier in the length of 48m, and extension of the boats syncrolift. Moreover, the harbor shall be deepened to -215.5m below sea, to enable access to vessels with a draft of 5m.Among the many improvements, the handicap access shall be improved by the construction of a disabled access ramp, and a new 15t winch shall be installed.

Main elements of the project

  • Measurements and markings at land and sea.
  • Supply and driving of combination wall 14.5 meters in length.
  • supply and driving of 18 meter long piles.
  • Excavation, filling and disposal of the surplus excavated
  • Supply and installation of a floating dock
  • Extension of the boats syncrolift, replacement of winch, engine, and towing experiment
  • Construction of disabled access ramp
  • Deepening the harbor to 215.5- below sea level
  • Concrete work