{"id":2592,"date":"2021-10-27T14:00:11","date_gmt":"2021-10-27T11:00:11","guid":{"rendered":"https:\/\/maagan.impact-israel.com\/projects\/2592\/"},"modified":"2021-12-06T10:47:15","modified_gmt":"2021-12-06T08:47:15","slug":"%d7%a4%d7%99%d7%aa%d7%95%d7%97-%d7%9e%d7%a2%d7%92%d7%9f-%d7%a2%d7%99%d7%9f-%d7%92%d7%91-%d7%a7%d7%98%d7%a2-%d7%a6%d7%a4%d7%95%d7%a0%d7%99","status":"publish","type":"post","link":"https:\/\/maagan-marine.com\/en\/projects\/2592\/","title":{"rendered":"Development of Ein-Gev Haven, North side"},"content":{"rendered":"<h4><\/h4>\n<h4><strong>Ordered By<\/strong><\/h4>\n<p>Government Tourist Corporation<\/p>\n<h4><strong>Project Overview<\/strong><\/h4>\n<p>The project \"Development of Ein-Gev Haven, North side\", entails the construction of a new pier in the length of 48m, and extension of the boats syncrolift. Moreover, the harbor shall be deepened to -215.5m below sea, to enable access to vessels with a draft of 5m.Among the many improvements, the handicap access shall be improved by the construction of a disabled access ramp, and a new 15t winch shall be installed.<\/p>\n<h4><strong>Main elements of the project<\/strong><\/h4>\n<ul>\n<li>Measurements and markings at land and sea.<\/li>\n<li>Supply and driving of combination wall 14.5 meters in length.<\/li>\n<li>supply and driving of 18 meter long piles.<\/li>\n<li>Excavation, filling and disposal of the surplus excavated<\/li>\n<li>Supply and installation of a floating dock<\/li>\n<li>Extension of the boats syncrolift, replacement of winch, engine, and towing experiment<\/li>\n<li>Construction of disabled access ramp<\/li>\n<li>Deepening the harbor to 215.5- below sea level<\/li>\n<li>Concrete work<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Ordered By Government Tourist Corporation Project Overview The project \"Development of Ein-Gev Haven, North side\", entails the construction of a new pier in the length of 48m, and extension of the boats syncrolift. Moreover, the harbor shall be deepened to -215.5m below sea, to enable access to vessels with a draft of 5m.Among the many [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2015,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[35],"tags":[],"class_list":["post-2592","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-marine-works-civil-engineering-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Development of Ein-Gev Haven, North side - \u05de\u05e2\u05d2\u05df<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maagan-marine.com\/en\/projects\/2592\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Development of Ein-Gev Haven, North side - \u05de\u05e2\u05d2\u05df\" \/>\n<meta property=\"og:description\" content=\"Ordered By Government Tourist Corporation Project Overview The project &quot;Development of Ein-Gev Haven, North side&quot;, entails the construction of a new pier in the length of 48m, and extension of the boats syncrolift. Moreover, the harbor shall be deepened to -215.5m below sea, to enable access to vessels with a draft of 5m.Among the many [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maagan-marine.com\/en\/projects\/2592\/\" \/>\n<meta property=\"og:site_name\" content=\"\u05de\u05e2\u05d2\u05df\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-27T11:00:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-12-06T08:47:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_159_project_pics_20.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"614\" \/>\n\t<meta property=\"og:image:height\" content=\"573\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#\\\/schema\\\/person\\\/0177521f200b5759ca34858b08375833\"},\"headline\":\"Development of Ein-Gev Haven, North side\",\"datePublished\":\"2021-10-27T11:00:11+00:00\",\"dateModified\":\"2021-12-06T08:47:15+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/\"},\"wordCount\":156,\"publisher\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/big_159_project_pics_20.jpg\",\"articleSection\":[\"\u05e2\u05d1\u05d5\u05d3\u05d5\u05ea \u05d9\u05de\u05d9\u05d5\u05ea \u05d5\u05d4\u05e0\u05d3\u05e1\u05d4 \u05d0\u05d6\u05e8\u05d7\u05d9\u05ea\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/\",\"url\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/\",\"name\":\"Development of Ein-Gev Haven, North side - \u05de\u05e2\u05d2\u05df\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/big_159_project_pics_20.jpg\",\"datePublished\":\"2021-10-27T11:00:11+00:00\",\"dateModified\":\"2021-12-06T08:47:15+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/#primaryimage\",\"url\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/big_159_project_pics_20.jpg\",\"contentUrl\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/big_159_project_pics_20.jpg\",\"width\":614,\"height\":573,\"caption\":\"Development of Ein-Gev Haven, North side\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2592\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u05d3\u05e3 \u05d4\u05d1\u05d9\u05ea\",\"item\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Development of Ein-Gev Haven, North side\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/\",\"name\":\"\u05de\u05e2\u05d2\u05df\",\"description\":\"\u05d4\u05e0\u05d3\u05e1\u05d4 \u05d9\u05de\u05d9\u05ea \u05d5\u05d0\u05d6\u05e8\u05d7\u05d9\u05ea | \u05d9\u05d9\u05d6\u05d5\u05dd \u05d5\u05d1\u05e0\u05d9\u05d9\u05d4\",\"publisher\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#organization\",\"name\":\"\u05de\u05e2\u05d2\u05df\",\"url\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/logo_maagan_marine@2x.png\",\"contentUrl\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/logo_maagan_marine@2x.png\",\"width\":618,\"height\":92,\"caption\":\"\u05de\u05e2\u05d2\u05df\"},\"image\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#\\\/schema\\\/person\\\/0177521f200b5759ca34858b08375833\",\"name\":\"admin\",\"sameAs\":[\"https:\\\/\\\/maagan.impact-israel.com\"],\"url\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/author\\\/impact\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Development of Ein-Gev Haven, North side - \u05de\u05e2\u05d2\u05df","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maagan-marine.com\/en\/projects\/2592\/","og_locale":"en_US","og_type":"article","og_title":"Development of Ein-Gev Haven, North side - \u05de\u05e2\u05d2\u05df","og_description":"Ordered By Government Tourist Corporation Project Overview The project \"Development of Ein-Gev Haven, North side\", entails the construction of a new pier in the length of 48m, and extension of the boats syncrolift. Moreover, the harbor shall be deepened to -215.5m below sea, to enable access to vessels with a draft of 5m.Among the many [&hellip;]","og_url":"https:\/\/maagan-marine.com\/en\/projects\/2592\/","og_site_name":"\u05de\u05e2\u05d2\u05df","article_published_time":"2021-10-27T11:00:11+00:00","article_modified_time":"2021-12-06T08:47:15+00:00","og_image":[{"width":614,"height":573,"url":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_159_project_pics_20.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/maagan-marine.com\/en\/projects\/2592\/#article","isPartOf":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2592\/"},"author":{"name":"admin","@id":"https:\/\/maagan-marine.com\/en\/#\/schema\/person\/0177521f200b5759ca34858b08375833"},"headline":"Development of Ein-Gev Haven, North side","datePublished":"2021-10-27T11:00:11+00:00","dateModified":"2021-12-06T08:47:15+00:00","mainEntityOfPage":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2592\/"},"wordCount":156,"publisher":{"@id":"https:\/\/maagan-marine.com\/en\/#organization"},"image":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2592\/#primaryimage"},"thumbnailUrl":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_159_project_pics_20.jpg","articleSection":["\u05e2\u05d1\u05d5\u05d3\u05d5\u05ea \u05d9\u05de\u05d9\u05d5\u05ea \u05d5\u05d4\u05e0\u05d3\u05e1\u05d4 \u05d0\u05d6\u05e8\u05d7\u05d9\u05ea"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/maagan-marine.com\/en\/projects\/2592\/","url":"https:\/\/maagan-marine.com\/en\/projects\/2592\/","name":"Development of Ein-Gev Haven, North side - \u05de\u05e2\u05d2\u05df","isPartOf":{"@id":"https:\/\/maagan-marine.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2592\/#primaryimage"},"image":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2592\/#primaryimage"},"thumbnailUrl":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_159_project_pics_20.jpg","datePublished":"2021-10-27T11:00:11+00:00","dateModified":"2021-12-06T08:47:15+00:00","breadcrumb":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2592\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maagan-marine.com\/en\/projects\/2592\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maagan-marine.com\/en\/projects\/2592\/#primaryimage","url":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_159_project_pics_20.jpg","contentUrl":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_159_project_pics_20.jpg","width":614,"height":573,"caption":"Development of Ein-Gev Haven, North side"},{"@type":"BreadcrumbList","@id":"https:\/\/maagan-marine.com\/en\/projects\/2592\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u05d3\u05e3 \u05d4\u05d1\u05d9\u05ea","item":"https:\/\/maagan-marine.com\/en\/"},{"@type":"ListItem","position":2,"name":"Development of Ein-Gev Haven, North side"}]},{"@type":"WebSite","@id":"https:\/\/maagan-marine.com\/en\/#website","url":"https:\/\/maagan-marine.com\/en\/","name":"\u05de\u05e2\u05d2\u05df","description":"\u05d4\u05e0\u05d3\u05e1\u05d4 \u05d9\u05de\u05d9\u05ea \u05d5\u05d0\u05d6\u05e8\u05d7\u05d9\u05ea | \u05d9\u05d9\u05d6\u05d5\u05dd \u05d5\u05d1\u05e0\u05d9\u05d9\u05d4","publisher":{"@id":"https:\/\/maagan-marine.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maagan-marine.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/maagan-marine.com\/en\/#organization","name":"\u05de\u05e2\u05d2\u05df","url":"https:\/\/maagan-marine.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maagan-marine.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/logo_maagan_marine@2x.png","contentUrl":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/logo_maagan_marine@2x.png","width":618,"height":92,"caption":"\u05de\u05e2\u05d2\u05df"},"image":{"@id":"https:\/\/maagan-marine.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/maagan-marine.com\/en\/#\/schema\/person\/0177521f200b5759ca34858b08375833","name":"admin","sameAs":["https:\/\/maagan.impact-israel.com"],"url":"https:\/\/maagan-marine.com\/en\/projects\/author\/impact\/"}]}},"_links":{"self":[{"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/posts\/2592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/comments?post=2592"}],"version-history":[{"count":3,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/posts\/2592\/revisions"}],"predecessor-version":[{"id":2749,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/posts\/2592\/revisions\/2749"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/media\/2015"}],"wp:attachment":[{"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/media?parent=2592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/categories?post=2592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/tags?post=2592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}