{"id":2584,"date":"2021-10-27T15:27:07","date_gmt":"2021-10-27T12:27:07","guid":{"rendered":"https:\/\/maagan.impact-israel.com\/projects\/2584\/"},"modified":"2021-12-06T11:33:34","modified_gmt":"2021-12-06T09:33:34","slug":"%d7%94%d7%a7%d7%9e%d7%aa-%d7%a7%d7%99%d7%a8-%d7%97%d7%95%d7%a6%d7%a5-%d7%91%d7%a1%d7%95%d7%9c%d7%9c%d7%94-5-8-%d7%91%d7%99%d7%9d-%d7%94%d7%9e%d7%9c%d7%97","status":"publish","type":"post","link":"https:\/\/maagan-marine.com\/en\/projects\/2584\/","title":{"rendered":"construction of a buffer battery wall at dead sea ponds 5-8"},"content":{"rendered":"<h4><strong>Ordered by<\/strong><\/h4>\n<p>Dead Sea Works<\/p>\n<h4><strong>Project Overview<\/strong><\/h4>\n<p>The Project \"construction of a buffer battery wall at dead sea ponds 5-8\", has been executed to construct a sealed sheet-pile wall in the length of 170m to lengthen the pond, by driving Larsen 607n sheet-piles. Before the piles were driven, a pre-drilling has been executed for the entire width and length of the pile. Driving has been done in pair's whereas the piles were connected by crimping via a prefabricated 3.5m high driving template - to ensure the final wall verticality. Due to the fact that the constructed wall should be fully sealed a use of a declutching system has been used which allowed checking that the sheet-pile has been driven properly without opening the locks. Driving of the sheet-piles was executed by the use of MAAGAN's 110M vibrational hammer and the D62 Diesel hammer.<\/p>\n<h4><strong>Main elements of the project<\/strong><\/h4>\n<ul>\n<li>Construction of a sealed sheet-pile wall in the length of 170m<\/li>\n<li>Performing pre-drilling in a diameter of 60cm to a final depth of -24m<\/li>\n<li>Driving of Larsen 607n sheet-piles 28m long.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Ordered by Dead Sea Works Project Overview The Project \"construction of a buffer battery wall at dead sea ponds 5-8\", has been executed to construct a sealed sheet-pile wall in the length of 170m to lengthen the pond, by driving Larsen 607n sheet-piles. Before the piles were driven, a pre-drilling has been executed for the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":2132,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[35],"tags":[],"class_list":["post-2584","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-marine-works-civil-engineering-en"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>construction of a buffer battery wall at dead sea ponds 5-8 - \u05de\u05e2\u05d2\u05df<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/maagan-marine.com\/en\/projects\/2584\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"construction of a buffer battery wall at dead sea ponds 5-8 - \u05de\u05e2\u05d2\u05df\" \/>\n<meta property=\"og:description\" content=\"Ordered by Dead Sea Works Project Overview The Project &quot;construction of a buffer battery wall at dead sea ponds 5-8&quot;, has been executed to construct a sealed sheet-pile wall in the length of 170m to lengthen the pond, by driving Larsen 607n sheet-piles. Before the piles were driven, a pre-drilling has been executed for the [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/maagan-marine.com\/en\/projects\/2584\/\" \/>\n<meta property=\"og:site_name\" content=\"\u05de\u05e2\u05d2\u05df\" \/>\n<meta property=\"article:published_time\" content=\"2021-10-27T12:27:07+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-12-06T09:33:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_172_project_pics_15.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#\\\/schema\\\/person\\\/0177521f200b5759ca34858b08375833\"},\"headline\":\"construction of a buffer battery wall at dead sea ponds 5-8\",\"datePublished\":\"2021-10-27T12:27:07+00:00\",\"dateModified\":\"2021-12-06T09:33:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/\"},\"wordCount\":193,\"publisher\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/big_172_project_pics_15.jpg\",\"articleSection\":[\"\u05e2\u05d1\u05d5\u05d3\u05d5\u05ea \u05d9\u05de\u05d9\u05d5\u05ea \u05d5\u05d4\u05e0\u05d3\u05e1\u05d4 \u05d0\u05d6\u05e8\u05d7\u05d9\u05ea\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/\",\"url\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/\",\"name\":\"construction of a buffer battery wall at dead sea ponds 5-8 - \u05de\u05e2\u05d2\u05df\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/big_172_project_pics_15.jpg\",\"datePublished\":\"2021-10-27T12:27:07+00:00\",\"dateModified\":\"2021-12-06T09:33:34+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/#primaryimage\",\"url\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/big_172_project_pics_15.jpg\",\"contentUrl\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/big_172_project_pics_15.jpg\",\"width\":1024,\"height\":576,\"caption\":\"construction of a buffer battery wall at dead sea ponds 5-8\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/2584\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u05d3\u05e3 \u05d4\u05d1\u05d9\u05ea\",\"item\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"construction of a buffer battery wall at dead sea ponds 5-8\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/\",\"name\":\"\u05de\u05e2\u05d2\u05df\",\"description\":\"\u05d4\u05e0\u05d3\u05e1\u05d4 \u05d9\u05de\u05d9\u05ea \u05d5\u05d0\u05d6\u05e8\u05d7\u05d9\u05ea | \u05d9\u05d9\u05d6\u05d5\u05dd \u05d5\u05d1\u05e0\u05d9\u05d9\u05d4\",\"publisher\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#organization\",\"name\":\"\u05de\u05e2\u05d2\u05df\",\"url\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/logo_maagan_marine@2x.png\",\"contentUrl\":\"https:\\\/\\\/maagan-marine.com\\\/wp-content\\\/uploads\\\/2021\\\/10\\\/logo_maagan_marine@2x.png\",\"width\":618,\"height\":92,\"caption\":\"\u05de\u05e2\u05d2\u05df\"},\"image\":{\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/#\\\/schema\\\/person\\\/0177521f200b5759ca34858b08375833\",\"name\":\"admin\",\"sameAs\":[\"https:\\\/\\\/maagan.impact-israel.com\"],\"url\":\"https:\\\/\\\/maagan-marine.com\\\/en\\\/projects\\\/author\\\/impact\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"construction of a buffer battery wall at dead sea ponds 5-8 - \u05de\u05e2\u05d2\u05df","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/maagan-marine.com\/en\/projects\/2584\/","og_locale":"en_US","og_type":"article","og_title":"construction of a buffer battery wall at dead sea ponds 5-8 - \u05de\u05e2\u05d2\u05df","og_description":"Ordered by Dead Sea Works Project Overview The Project \"construction of a buffer battery wall at dead sea ponds 5-8\", has been executed to construct a sealed sheet-pile wall in the length of 170m to lengthen the pond, by driving Larsen 607n sheet-piles. Before the piles were driven, a pre-drilling has been executed for the [&hellip;]","og_url":"https:\/\/maagan-marine.com\/en\/projects\/2584\/","og_site_name":"\u05de\u05e2\u05d2\u05df","article_published_time":"2021-10-27T12:27:07+00:00","article_modified_time":"2021-12-06T09:33:34+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_172_project_pics_15.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/maagan-marine.com\/en\/projects\/2584\/#article","isPartOf":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2584\/"},"author":{"name":"admin","@id":"https:\/\/maagan-marine.com\/en\/#\/schema\/person\/0177521f200b5759ca34858b08375833"},"headline":"construction of a buffer battery wall at dead sea ponds 5-8","datePublished":"2021-10-27T12:27:07+00:00","dateModified":"2021-12-06T09:33:34+00:00","mainEntityOfPage":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2584\/"},"wordCount":193,"publisher":{"@id":"https:\/\/maagan-marine.com\/en\/#organization"},"image":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2584\/#primaryimage"},"thumbnailUrl":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_172_project_pics_15.jpg","articleSection":["\u05e2\u05d1\u05d5\u05d3\u05d5\u05ea \u05d9\u05de\u05d9\u05d5\u05ea \u05d5\u05d4\u05e0\u05d3\u05e1\u05d4 \u05d0\u05d6\u05e8\u05d7\u05d9\u05ea"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/maagan-marine.com\/en\/projects\/2584\/","url":"https:\/\/maagan-marine.com\/en\/projects\/2584\/","name":"construction of a buffer battery wall at dead sea ponds 5-8 - \u05de\u05e2\u05d2\u05df","isPartOf":{"@id":"https:\/\/maagan-marine.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2584\/#primaryimage"},"image":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2584\/#primaryimage"},"thumbnailUrl":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_172_project_pics_15.jpg","datePublished":"2021-10-27T12:27:07+00:00","dateModified":"2021-12-06T09:33:34+00:00","breadcrumb":{"@id":"https:\/\/maagan-marine.com\/en\/projects\/2584\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/maagan-marine.com\/en\/projects\/2584\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maagan-marine.com\/en\/projects\/2584\/#primaryimage","url":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_172_project_pics_15.jpg","contentUrl":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/big_172_project_pics_15.jpg","width":1024,"height":576,"caption":"construction of a buffer battery wall at dead sea ponds 5-8"},{"@type":"BreadcrumbList","@id":"https:\/\/maagan-marine.com\/en\/projects\/2584\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u05d3\u05e3 \u05d4\u05d1\u05d9\u05ea","item":"https:\/\/maagan-marine.com\/en\/"},{"@type":"ListItem","position":2,"name":"construction of a buffer battery wall at dead sea ponds 5-8"}]},{"@type":"WebSite","@id":"https:\/\/maagan-marine.com\/en\/#website","url":"https:\/\/maagan-marine.com\/en\/","name":"\u05de\u05e2\u05d2\u05df","description":"\u05d4\u05e0\u05d3\u05e1\u05d4 \u05d9\u05de\u05d9\u05ea \u05d5\u05d0\u05d6\u05e8\u05d7\u05d9\u05ea | \u05d9\u05d9\u05d6\u05d5\u05dd \u05d5\u05d1\u05e0\u05d9\u05d9\u05d4","publisher":{"@id":"https:\/\/maagan-marine.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/maagan-marine.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/maagan-marine.com\/en\/#organization","name":"\u05de\u05e2\u05d2\u05df","url":"https:\/\/maagan-marine.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/maagan-marine.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/logo_maagan_marine@2x.png","contentUrl":"https:\/\/maagan-marine.com\/wp-content\/uploads\/2021\/10\/logo_maagan_marine@2x.png","width":618,"height":92,"caption":"\u05de\u05e2\u05d2\u05df"},"image":{"@id":"https:\/\/maagan-marine.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/maagan-marine.com\/en\/#\/schema\/person\/0177521f200b5759ca34858b08375833","name":"admin","sameAs":["https:\/\/maagan.impact-israel.com"],"url":"https:\/\/maagan-marine.com\/en\/projects\/author\/impact\/"}]}},"_links":{"self":[{"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/posts\/2584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/comments?post=2584"}],"version-history":[{"count":1,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/posts\/2584\/revisions"}],"predecessor-version":[{"id":2758,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/posts\/2584\/revisions\/2758"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/media\/2132"}],"wp:attachment":[{"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/media?parent=2584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/categories?post=2584"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/maagan-marine.com\/en\/wp-json\/wp\/v2\/tags?post=2584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}